Current Tender

Tender 0510025234

Design & Construction of the Roof at Newport Reservoir

  • Date advertised:
    28 April 2015
  • Closing date:
    04 June 2015
  • Tender Closing: Thursday 4th June 2015 at 9:30am

    Contact: Peter Gray

    Tel: 02 8849 5147

    email: peter.gray@sydneywater.com.au

    Cost of document: $100.00 (non-refundable)

    The tender documents are available for purchase and downloading from Sydney Water''s nominated website https://tenders.nsw.gov.au/sydneywater

    1. Background

    This project is for the full roof replacement, localised internal lining repairs, and installation of new stair tower for Newport Reservoir (WS0211). The project will be delivered as a design and construct contract.

    The scope of work broadly comprises of the following:

    Design and Construction - Roofing & Repair works – demolition of the existing roof structure including removal and disposal of existing roof elements and sheeting, installation of new steel roof members and installation of new aluminium roof sheeting, installation of internal ladder and platform, installation of new access hatches, equipment hatches and dosing ports, and localised repairs of the epoxy coating.

    Construction Only – Construction of a new access Stair Tower to service both WS0211 and WS0079.

    2. Mandatory Requirements

    Listed below are a list of mandatory requirements & weighting criteria which will be used by Sydney Water to determine the validity of all tender submissions provided for these projects.

    M1 Occupational Health and Safety (minimum requirements)

    M1.1 Past OHS Performance

    M1.2 Management System Accreditation

    M1.3 Demonstrated commitment to the CRC Construction Safety Competency Framework.

    M2 Assessed financial capability to perform the contract.

    M3 Quality Management System Certification to AS/NZS ISO 9001:2000.

    3. Weighting Evaluation Criteria.

    W1 Occupational Health and Safety 20%

    W1.1 Hazard Control Plan 10%

    W1.2 Management of Risks 10%

    W2 Proposed methodology and understanding 80%

    W2.1 Program / timing 20%.

    W2.2 Understanding of scope and Methodology 20%.

    W2.3 Resourcing and experience 20%.

    W2.4 Proposed Design 20%.

    TOTAL 100%